This includes at a minimum:
Cleaning of the machine
Check of safety features
Repair of malfunctions within the machine
Repair of machine guarding and covers
Repair of the original machine paint
Final test run of the machine for several hours with test report
This can mean for example:
Cleaning of the machine
Dis-assembly of the locking unit
Renewal of bushes, tie bars, tie bar nuts and seals
Overhaul of the closing cylinder
New ejector cylinder
Repair of the lubrication system
Assembly and adjustment of the locking unit
Overhaul and new seals of the tear-off cylinder (hot chamber machines)
Overhaul and new seals for the shot positioning cylinder of the injection unit (cold chamber machines)
New hydraulic hoses
Check of safety features
Repair of machine guarding and covers
Repair of the original machine paint
Final test run of the machine for several hours with test report
Six months warranty on the locking unit and on the hydraulic cylinders
This comprises at a minimum of:
Cleaning and sand blasting of the machine
Dis-assembly of the locking unit
Renewal of bushes, tie bars, tie bar nuts and seals
Overhaul of the closing cylinder
New ejector cylinder
Repair of the lubrication system
Assembly and adjustment of the locking unit
Overhaul and new seals of the tear-off cylinder (hot chamber machines)
Overhaul and new seals for the shot positioning cylinder of the injection unit (cold chamber machines)
New hydraulic pump and overhaul of the motor
New hydraulic hoses
New hydraulic valves
Overhaul of the hydraulic manifolds
Repair and cleaning of the hydraulic pipes
New electrical installation including new cables and new limit switches
New, state-of-the-art control cabinet
Check of safety features
New machine painting
Final test run of the machine for several hours with test report
Acceptance test with CE-approval
Six months warranty on the whole machine